Saurina, Nia, G, and H. 2024. “Production Scheduling Application And Ordering Sandals At Cv Toyobo Based On Android With Earliest Due Date Method”. JUSIBI (Jurnal Sistem Informasi Dan E-Bisnis) 6 (1):27-39. https://doi.org/10.54650/jusibi.v6i1.520.